A major Colorado water supply project faced a difficult choice. Meeting its obligations to protect a threatened species could impose permanent restrictions on land needed for reservoir operations and maintenance.
Rather than attempt to reconcile those competing uses on the same property, we developed an alternative: a conservation bank that would protect and restore habitat nearby, allowing Northern Water to meet much of its mitigation requirement without unnecessarily constraining its infrastructure.
The result was a different approach to conservation compliance, one that reduced operating restrictions and long-term management costs while financing the permanent protection of more than 250 acres of habitat.
The starting point: Conservation obligations affecting a major water supply project
Northern Water, one of Colorado's major water management organizations, is responsible for developing and operating water infrastructure serving communities and agricultural users along the Front Range.
Through the Northern Integrated Supply Project (NISP), Northern Water is developing a new water supply system for 15 municipalities and water districts in Northern Colorado. The project includes two reservoirs, Glade and Galeton, and associated infrastructure intended to provide up to 40,000 acre-feet of additional water annually.
The project also carries substantial environmental responsibilities.
One of the species affected by the development is the Preble's meadow jumping mouse, a federally threatened species that depends on riparian habitat along streams and waterways. The mouse relies on areas with dense vegetation, including willows and other plants associated with wetlands and stream corridors.
Northern Water needed to compensate for impacts to this habitat as part of its federal environmental permitting obligations.
The initial approach was to provide much of the required habitat mitigation on-site around Glade Reservoir and at the foot of the dam.
At first glance, this appeared reasonable. The project would affect habitat in the area, so why not provide replacement habitat nearby?
But this approach created a significant operational problem.
The problem: Permanent habitat protection and reservoir operations do not always fit together
A water supply reservoir is an operating asset. Water levels fluctuate depending on available supplies and demand. Infrastructure must remain accessible for inspections, repairs, maintenance, and potential future modifications.
Permanently protected habitat creates a different set of requirements. Land management must prioritize the conservation objectives, and activities that could affect the protected species or its habitat may be restricted.
Combining these requirements on the same property introduces potential conflicts.
For Northern Water, establishing protected habitat near essential reservoir infrastructure could limit access to areas needed for maintenance or future operations. Habitat management could also impose additional requirements for maintaining water and vegetation conditions, even when those requirements were not aligned with the reservoir's primary purpose.
The issue was particularly important because these obligations would continue long after construction.
Northern Water was therefore considering a solution that could satisfy its environmental requirements but create restrictions and costs throughout the operating life of the infrastructure.
The question was whether these constraints were actually necessary to achieve the intended conservation outcome.
The shift: Separate the location of the impact from the location of the conservation
We approached the problem differently.
Rather than assume that habitat mitigation needed to be delivered alongside the reservoir, we considered whether a more suitable property nearby could provide the required conservation benefits without interfering with water operations.
The distinction was important.
The objective of the mitigation requirement was to protect and restore habitat for the Preble's meadow jumping mouse. It was not necessarily to establish that habitat on land that Northern Water would need to operate as a reservoir.
If suitable habitat could be restored and protected elsewhere in the same ecological and regulatory service area, Northern Water could meet its conservation obligations while avoiding unnecessary restrictions on its infrastructure.
This was the opportunity that led to Table Top Conservation Bank.
Instead of asking Northern Water to develop, permit, and maintain its own mitigation property, a dedicated conservation bank could undertake those responsibilities and make approved conservation credits available for purchase.
Northern Water would pay for the conservation benefits it needed, while the bank would assume responsibility for delivering and maintaining the corresponding habitat.
The two activities could then be managed according to their respective purposes: water infrastructure for reliable water supply, and conservation land for the long-term protection of the species.
Developing Table Top Conservation Bank
Working with partners, Ben Guillon developed Table Top Conservation Company to establish a conservation bank for the Preble's meadow jumping mouse in Larimer County.
The project was developed on property owned by the Colorado State Land Board, which manages state trust lands to generate revenue for Colorado's public schools.
Rather than purchasing the land outright, the conservation company established an arrangement allowing private capital to finance habitat protection and restoration while the State Land Board retained ownership.
The property was placed under a permanent conservation easement held by Colorado Open Lands. Habitat restoration and management activities were designed to improve conditions for the mouse, including riparian vegetation management, planting, and the control of invasive species.
The bank was developed through a lengthy regulatory process with the U.S. Fish and Wildlife Service. It required establishing the biological standards, conservation commitments, crediting methodology, and long-term arrangements needed for the agency to approve the sale of credits.
The process took years, but the resulting structure offered developers and infrastructure operators a simpler alternative to developing their own mitigation sites.
Approved in 2021, Table Top became Colorado's first privately operated habitat conservation bank.
The bank protects more than 250 acres of habitat. Its credits can be used by eligible projects to compensate for impacts to the Preble's meadow jumping mouse, subject to applicable regulatory approvals.
This created a practical alternative for Northern Water.
A different solution for Northern Water
Table Top is located near Livermore, a relatively short distance from the proposed Glade Reservoir.
It was close enough to serve the project's mitigation needs under the applicable regulatory framework, but sufficiently separate from the reservoir to avoid the operational constraints that would arise from protecting habitat immediately alongside critical infrastructure.
Northern Water evaluated the purchase of conservation credits as an alternative to developing additional mitigation habitat on its own project lands.
The advantages extended beyond the initial cost of conservation.
Under the conservation bank model, the bank is responsible for the long-term management and monitoring associated with its credits. Northern Water could satisfy the corresponding mitigation requirements without taking on those habitat-management responsibilities itself.
That arrangement also reduced uncertainty associated with establishing and maintaining vegetation on the proposed project mitigation site.
Northern Water's own procurement assessment identified several specific benefits of purchasing Table Top credits, including reduced restrictions on land near Glade Reservoir's dam and pump station, lower long-term water requirements, reduced maintenance obligations, and lower project risk.
The financial comparison also became increasingly favorable.
By 2024, Northern Water's assessment indicated that constructing additional mitigation habitat at its Owl Creek site would cost approximately twice as much as purchasing an equivalent amount of conservation credits.
The bank therefore offered a way to address both the environmental requirement and the operating economics of the project.
From an alternative concept to an approved transaction
Northern Water moved forward with the conservation bank approach.
In 2023, Northern Water approved a purchase agreement for 6.71 riparian habitat credits from Table Top Conservation Company, with a contract value of approximately $1.27 million.
The agreement established a clear division of responsibilities. Table Top would provide the approved conservation credits and remain responsible for the corresponding long-term conservation obligations, rather than transferring those ongoing habitat-management requirements to Northern Water.
Northern Water subsequently considered and approved additional credit reservation agreements as it continued to reduce the extent of on-site mitigation needed for the project.
These decisions demonstrated that the conservation bank was more than a theoretical alternative. It had become a practical component of Northern Water's environmental compliance and infrastructure planning.
The arrangement did not eliminate every mitigation obligation associated with NISP. Nor was the purpose to avoid the project's environmental responsibilities.
It allowed Northern Water to satisfy a substantial portion of its obligations for the Preble's meadow jumping mouse through an established conservation mechanism, while reducing the need to dedicate additional project lands to permanent habitat management.
The broader results
The approach created benefits beyond Northern Water's immediate requirements.
For Northern Water, the conservation bank reduced the potential conflict between environmental compliance and infrastructure operations. It also provided greater certainty about the cost and management responsibilities associated with a portion of its species mitigation.
For conservation, it directed funding toward the permanent protection and restoration of habitat on a property dedicated to that purpose.
For the Colorado State Land Board, the arrangement created a new source of revenue from state trust land. The Board receives a share of conservation credit sales, with proceeds supporting Colorado's public schools.
The project also demonstrated that private capital could finance conservation on publicly owned land without requiring the state to sell the underlying property.
In 2022, Ben Guillon and Table Top Conservation Company received the Colorado State Land Board's Lessee of the Year Award in recognition of the project.
The experience has subsequently informed our work on a broader conservation banking framework intended to make similar opportunities available to additional landowners along Colorado's Front Range.
What this project illustrates
The original challenge was not simply how to provide habitat mitigation for a threatened species. It was how to fulfill that requirement without compromising the long-term function of a major infrastructure asset.
Keeping conservation and infrastructure operations on the same property appeared to be the straightforward approach, but it created costs and restrictions that were not essential to achieving the conservation objective.
By separating the two, we were able to develop an arrangement in which each activity could be managed more effectively.
Northern Water obtained a practical way to meet its environmental requirements while preserving greater flexibility for reservoir operations. The conservation bank secured long-term habitat protection and restoration on suitable land nearby.
The result was not a reduction in conservation ambition. It was a different way to achieve it, with fewer conflicts and better economics.